Sunday, April 21, 2013

Begin fuel tank assembly

With the fuel tank stiffeners cut, deburred and dimpled and the skin prepped, it was time to begin Prosealing the left fuel tank.  I reviewed the several methods people use to accomplish this task, and reached out to a few of my builder friends.  I decided to use the following procedure to Proseal the stiffeners to the tank skin:
  • Thoroughly scuff stiffener and skin attach area with maroon Scotchbrite pad
  • Clean stiffener and skin with acetone
  • Place a small dab of Proseal in dimples from the outside of the tank skin
  • Insert rivets and tape in place with rivet tape
  • Apply a thin layer of Proseal directly to stiffener and place stiffener over rivets
  • Back rivet stiffeners to tank skin
  • Use syringe to run a bead of Proseal around perimeter of stiffener.  Smooth with popsicle stick to form nice filet
  • Place dab of Proseal on each shop head, completely covering shop head and dimple
  • Check for gaps in Proseal coverage, and fill accordingly
After using this procedure for several stiffeners, I decided to try applying the Proseal directly to the skin rather than to the stiffener.  Using a hobby paintbrush with the bristles cut down, it was easy to apply the Proseal to the skin and obtain a nice uniform layer.  This method worked better for me.

Workbench covered with plastic sheet to keep everything clean
All materials laid out for convenient access
Thin layer of Proseal applied to stiffener
Alternate method - apply Proseal to skin with syringe and spread with brush
Back riveting stiffeners
Left side tank stiffeners completed

No comments:

Post a Comment