Showing posts with label Left elevator. Show all posts
Showing posts with label Left elevator. Show all posts

Sunday, April 15, 2012

Completed rudder and elevator leading edges

I've been working on finishing the last items on the empennage over the last few days.  My wing kit arrived a few days ago, and I'm anxious to start working on the forward spar.  The leading edges on the elevators and rudder needed to be closed up, and I have a small amount of work on the left elevator where the trim tab motor sits, and that's it for the tail section!  

Getting the leading edges of the elevators and the rudder to come together nicely takes a bit of work.  It's easy to roll the leading edges, but it's challenging to get the outer skin to sit flush without any gaps after the blind rivets have been set.  To resolve this, I ended up slightly over bending the outer skin, which allows the two skins to sit flush next to one another.   Bending one section at a time, outboard to inboard, makes the process easier.

Several builders have written that they used a pipe wrench to grip the dowel (3/4 inch) that is used to roll the leading edge.  I found that a steel handle, such as that used for a bending brake, worked much better when inserted into a hole drilled through the dowel.  The wrench was hitting the forward spar of the elevator, limiting the amount the leading edge could be rolled.  Using the steel handle at the inboard end of the elevator by the control horn eliminated this issue.  

After I had the skins rolled, I taped them in place with strips of duct tape and match drilled the holes.  I didn't find it necessary to use the ultra sticky duct tape that some builders use - the standard duct tape worked great, and didn't take the primer or blue vinyl off where I didn't want it removed.  The tape was then removed, the holes deburred (with a scotchbrite pad on the interior surface), and the blind rivets were set.  I wasn't happy with one of the elevators after it was finished, so I drilled out the rivets, slightly adjusted the leading edges by bending the skin a bit more, and re-riveted.  I was very pleased with the results.

Two sections rolled on right elevator

Right elevator leading edge finished
Left elevator leading edge clecoed - ready to be match drilled
Two sections on rudder complete - one to go
Rudder leading edge finished
The completed airplane parts are getting larger!

Saturday, February 11, 2012

Trim Tab

Many people make the trim tab several times until they are satisfied with it, so as on the trim tab opening on the left elevator, I practiced making my bends on some scrap aluminum before I made the those on the trim tab itself.  This procedure worked well for me, and I'm happy with how the trim tab turned out.

Prior to making the first bend, I sandwiched the skin between some angled pieces of oak and clamped them to my workbench.  I used double sided tape on the skin to prevent the oak wedge from slipping while the bending was taking place.  I made the initial bend with another piece of wood, which I used to push the skin down toward the forming blocks.  After that was finished, I used my rivet gun with low pressure (approx. 10 psi) with a flush set to complete the bend.  Prior to bending, I made a radius on the oak wedge upper edge, which allows the skin to from a nice radius rather than a sharp angle.  My initial practice pieces had very sharp angles that would eventually crack.  With the bottom side finished, the assembly was turned over, re-clamped to the table, and the process repeated.  The same procedure was then used for the inboard edge.

With all the bends complete, the hinge was drilled and attached to the trim tab and later to the elevator.  The trim tab motor and cover plate were assembled, and the control horn was riveted to the trim tab.   A few of the rivets for the control horn near the trailing edge are a bit difficult to reach, so I riveted the control horn prior to setting the rivets in the trim tab edges.  This allows the trim tab to be opened, which makes it easier to access the more challenging rivets for the control horn.  With that step complete, the remaining rivets were set.

First bend is made around angled oak blocks
Inboard edge bends completed
Control horn riveted to trim tab skin
Hinge riveted to leading edge of trim tab and fit to elevator
Rivets set attaching hinge to elevator
Trim tab motor assembly work
Motor assembly completed

Monday, January 16, 2012

Left elevator (cont.)

With the stiffeners in place and the skeleton riveted together, it was time to bend the trailing edge.  This process is much easier the second time, as you're not as concerned about messing it up.  I made the bend with my wood bending brake, and the skin rests nicely on the skeleton with no clecos installed.  With the trailing edge finished, I was able to bend the tabs on the elevator for the trim tab opening.  After a little practice, I placed a wedge inside the skin with another wedge on top of the skin, clamped the whole assembly to the workbench, and made the first bend of the lower tab.  Then the top tab was bent, and the remaining rivets were squeezed. 

After trailing edge is bent, the skin rests on the front spar
Practice bend on piece of scrap aluminum
First tab bend (bottom) on elevator
Top and bottom bends finished - ready for rivets
Ready to squeeze perimeter rivets
Squeezing outboard rivets
Counterbalance weight attached
Left elevator main structure complete
Left and right elevators side by side for the first time - very cool !

Monday, January 2, 2012

Left elevator

The left elevator construction is virtually identical to the right elevator, with the exception of the trim tab.  While this seems like a small difference, I found that it took quite a bit more time than the right side, although I was very pleased with the results.  I started by deburring all of the skeleton parts and the skin, and removing the vinyl from the rivet lines on the skin.  There is a reinforcement plate that fits where the trim tab servo mounts that requires platenuts, to which the trim tab cover will attach.

Many people rebuild the trim tab several times, so I took that as a sign that practice was in order.  Bending the tabs on the inboard and outboard ends of the trim tab, as well as those on the trim tab opening of the elevator, are some of the more challenging tasks of the empennage construction.  I traced the trim tabs onto some scrap aluminum, cut them out, and clamped them to the wood blocks I fabricated for this task.  I learned how the aluminum responds to various bending techniques, including a low pressure rivet gun, and what I would need to do on the real tabs to make them turn out well.  My practice pieces got progressively better, and after the third one I made the bends on the real parts.  I think it turned out very well.

 
Deburring left elevator parts
Removed vinyl from left elevator skin
Ready for initial assembly
Skeleton coming together
Fitting trim access reinforcement plate
Platenuts installed on reinforcement plate
Skin match drilled to skeleton
Stiffeners match drilled to skin
Riveting skeleton together
Stiffeners riveted to skin