Tuesday, July 5, 2011
New workshop, new table
Following the move to my new workshop, I went ahead and built an EAA Chapter 1000 standard table. As per the suggestion of a fellow builder, I constructed the table top with a two inch overhang on each side, which will allow parts to be clamped to the table if necessary. I was very pleased with the results, and the table has turned out to be a terrific addition to the workshop. I like the table so much, I may build another one in the future if necessary.
Rear spar work
It's been a little while since my last post. I moved my workshop recently, and also moved into a new home. Building should return to a more normal schedule now though, and I'm excited to see some of the empennage parts coming together.
I finished rounding the HS609PP rear spar reinforcement bars, which turned out well. I have included a before and after picture. After both of the 609PPs were finished, I match drilled them to the HS603PP rear spars, and placed all of the hinge brackets.
I finished rounding the HS609PP rear spar reinforcement bars, which turned out well. I have included a before and after picture. After both of the 609PPs were finished, I match drilled them to the HS603PP rear spars, and placed all of the hinge brackets.
Before (left) and after shots of HS609PP rear spar reinforcement bars |
Completed HS609PPs clecoed to the HS603PP rear spars following match drilling. |
Subscribe to:
Posts (Atom)